Line 61: Line 61:
  
 
|-
 
|-
! scope="row"| 2
+
! scope="row"| 1
 
| 03/04/2024
 
| 03/04/2024
 
| 03/10/2024
 
| 03/10/2024
 
|
 
|
* Learn about the Busmaster.
+
* Learn about the Busmaster and dbc.
* Build  db9 connector and connect to Busmaster.
+
* Connect db9 to Busmaster.
* Distribute modules to each team member.
+
* Assign tasks to each team member.
 +
| <font color = "red">Incomplete
  
| <font color = "red">Incomplete
 
 
|-
 
|-
! scope="row"| 3
+
! scope="row"| 2
 
| 03/11/2024
 
| 03/11/2024
 
| 03/17/2024
 
| 03/17/2024
 
|
 
|
* Finalize and acquire sensors and RC car parts.
+
* Finish up RC Car Infrastructure.
* Explore plug-and-play mounting of sensors and SJ2 boards.
+
* Get all the sensors and parts.
 +
* PLay with sensors and SJ2 boards.
 +
| <font color = "red">Incomplete
  
| <font color = "red">Incomplete
 
 
|-
 
|-
! scope="row"| 4
+
! scope="row"| 3
 
| 03/18/2024
 
| 03/18/2024
 
| 03/24/2024
 
| 03/24/2024
 
|
 
|
* Create initial dbc
+
* Start working on dbc and mobile app.
* Get Data from Ultrasonic Sensors
+
* Integrate sensors with SJ2 boards.
* Get data from GPS
+
* Get Data from different modules(GPS, Sensors).
* Get motors working
+
* starting to check on motor.
* Develop LCD module
+
| <font color = "red">Incomplete
* Develop Bluetooth / WiFi module ESP8266
 
  
| <font color = "red">Incomplete
 
 
|-
 
|-
! scope="row"| 5
+
! scope="row"| 4
 
| 03/25/2024
 
| 03/25/2024
 
| 03/31/2024
 
| 03/31/2024
 
|
 
|
* Interface Geo sensor with Geo controller
+
* Develop LCD module.
* Interface motors with motor module
+
* Start working on driver module.
* Interface ultrasonic sensors with sensor module
+
* Work on Bluetooth/WIFI module.
* Interface LCD and driver module
+
* Work on Geo sensor with Geo controller.
* Basic mobile app setup
+
* Work on motors with motor module.
 +
* Work on ultrasonic sensors with sensor module.
 +
* Continue work on mobile app.
 +
| <font color = "red">Incomplete
  
| <font color = "red">Incomplete
 
 
|-
 
|-
! scope="row"| 6
+
! scope="row"| 5
 
| 04/01/2024
 
| 04/01/2024
 
| 04/07/2024
 
| 04/07/2024
 
|
 
|
PROTOTYPE 1
+
* PROTOTYPE 1
* Connect sensor-driver-motor modules
+
* Build the car with all the modules.
* Assemble hardware
+
* Create unit/integration tests.
* Setup integration tests
+
| <font color = "red">Incomplete
  
| <font color = "red">Incomplete
 
 
|-
 
|-
! scope="row"| 7
+
! scope="row"|6
 
| 04/08/2024
 
| 04/08/2024
 
| 04/14/2024
 
| 04/14/2024
 
|
 
|
* Integrate Geo/GPS module with connected hardware
+
* Get the speed measuring sensor.
* Motors with PID control
+
* Motors with PID control.
* Obstacle avoidance
+
| <font color = "red">Incomplete
  
| <font color = "red">Incomplete
 
 
|-
 
|-
! scope="row"| 8
+
! scope="row"| 7
 
| 04/15/2024
 
| 04/15/2024
 
| 04/21/2024
 
| 04/21/2024
 
|
 
|
PROTOTYPE 2
+
* PROTOTYPE 2
 
* Integrate bluetooth module
 
* Integrate bluetooth module
* Start with mobile app
+
* Continue with mobile app
 +
| <font color = "red">Incomplete
  
| <font color = "red">Incomplete
 
 
|-
 
|-
! scope="row"| 9
+
! scope="row"| 8
 
| 04/22/2024
 
| 04/22/2024
 
| 04/28/2024
 
| 04/28/2024
 
|
 
|
* Interface mobile app with RC car
+
* Finalize/Connect mobile app with RC car.
 +
* Obstacle avoidance.
 +
| <font color = "red">Incomplete
  
| <font color = "red">Incomplete
 
 
|-
 
|-
! scope="row"| 10
+
! scope="row"| 9
 
| 04/29/2024
 
| 04/29/2024
 
| 05/05/2024
 
| 05/05/2024
 
|
 
|
PROTOTYPE 3
+
* PROTOTYPE 3
 
* Prepare for outdoor tests.
 
* Prepare for outdoor tests.
 +
| <font color = "red">Incomplete
  
| <font color = "red">Incomplete
 
 
|-
 
|-
! scope="row"| 11
+
! scope="row"| 10
 
| 05/06/2024
 
| 05/06/2024
 
| 05/12/2024
 
| 05/12/2024
 
|
 
|
PROTOTYPE 4
+
* PROTOTYPE 4
 
* Perform outdoors tests and recalibrate.
 
* Perform outdoors tests and recalibrate.
 +
| <font color = "red">Incomplete
  
| <font color = "red">Incomplete
 
 
|-
 
|-
! scope="row"| 12
+
! scope="row"| 11
 
| 05/13/2024
 
| 05/13/2024
 
| 05/19/2024
 
| 05/19/2024
 
|
 
|
 
* Final Demo
 
* Final Demo
 
| <font color = "red">Incomplete
 
|-
 
! scope="row"| 13
 
| 05/20/2024
 
| 05/26/2024
 
|
 
* TBD
 
 
 
| <font color = "red">Incomplete
 
| <font color = "red">Incomplete
  

Revision as of 22:44, 10 March 2024

Project Title

Gran Turismo

Abstract

<2-3 sentence abstract>

Introduction

The project was divided into N modules:

  • Sensor ...
  • Motor..
  • ...
  • Android

Team Members & Responsibilities

<Team Picture>

Gitlab Project Link - [1]

<Provide ECU names and members responsible> <One member may participate in more than one ECU>

  • Sensor
    • Link to Gitlab user1
    • Link to Gitlab user2
  • Motor
    • Link to Gitlab user1
    • Link to Gitlab user2
  • Geographical
    • Link to Gitlab user1
    • Link to Gitlab user2
  • Communication Bridge Controller & LCD
    • Link to Gitlab user1
    • Link to Gitlab user2
  • Android Application
    • Link to Gitlab user1
    • Link to Gitlab user2
  • Testing Team
    • Link to Gitlab user1
    • Link to Gitlab user2


Schedule

Week# Start Date End Date Task Status
1 03/04/2024 03/10/2024
  • Learn about the Busmaster and dbc.
  • Connect db9 to Busmaster.
  • Assign tasks to each team member.
Incomplete
2 03/11/2024 03/17/2024
  • Finish up RC Car Infrastructure.
  • Get all the sensors and parts.
  • PLay with sensors and SJ2 boards.
Incomplete
3 03/18/2024 03/24/2024
  • Start working on dbc and mobile app.
  • Integrate sensors with SJ2 boards.
  • Get Data from different modules(GPS, Sensors).
  • starting to check on motor.
Incomplete
4 03/25/2024 03/31/2024
  • Develop LCD module.
  • Start working on driver module.
  • Work on Bluetooth/WIFI module.
  • Work on Geo sensor with Geo controller.
  • Work on motors with motor module.
  • Work on ultrasonic sensors with sensor module.
  • Continue work on mobile app.
Incomplete
5 04/01/2024 04/07/2024
  • PROTOTYPE 1
  • Build the car with all the modules.
  • Create unit/integration tests.
Incomplete
6 04/08/2024 04/14/2024
  • Get the speed measuring sensor.
  • Motors with PID control.
Incomplete
7 04/15/2024 04/21/2024
  • PROTOTYPE 2
  • Integrate bluetooth module
  • Continue with mobile app
Incomplete
8 04/22/2024 04/28/2024
  • Finalize/Connect mobile app with RC car.
  • Obstacle avoidance.
Incomplete
9 04/29/2024 05/05/2024
  • PROTOTYPE 3
  • Prepare for outdoor tests.
Incomplete
10 05/06/2024 05/12/2024
  • PROTOTYPE 4
  • Perform outdoors tests and recalibrate.
Incomplete
11 05/13/2024 05/19/2024
  • Final Demo
Incomplete


Parts List & Cost

Item# Part Desciption Vendor Qty Cost
1 RC Car Traxxas 1 $250.00
2 CAN Transceivers MCP2551-I/P Microchip [2] 8 Free Samples


Printed Circuit Board

<Picture and information, including links to your PCB>



CAN Communication

<Talk about your message IDs or communication strategy, such as periodic transmission, MIA management etc.>

Hardware Design

<Show your CAN bus hardware design>

DBC File

<Gitlab link to your DBC file> <You can optionally use an inline image>




Sensor ECU

<Picture and link to Gitlab>

Hardware Design

Software Design

<List the code modules that are being called periodically.>

Technical Challenges

< List of problems and their detailed resolutions>



Motor ECU

<Picture and link to Gitlab>

Hardware Design

Software Design

<List the code modules that are being called periodically.>

Technical Challenges

< List of problems and their detailed resolutions>



Geographical Controller

<Picture and link to Gitlab>

Hardware Design

Software Design

<List the code modules that are being called periodically.>

Technical Challenges

< List of problems and their detailed resolutions>





Communication Bridge Controller & LCD

<Picture and link to Gitlab>

Hardware Design

Software Design

<List the code modules that are being called periodically.>

Technical Challenges

< List of problems and their detailed resolutions>



Master Module

<Picture and link to Gitlab>

Hardware Design

Software Design

<List the code modules that are being called periodically.>

Technical Challenges

< List of problems and their detailed resolutions>



Mobile Application

<Picture and link to Gitlab>

Hardware Design

Software Design

<List the code modules that are being called periodically.>

Technical Challenges

< List of problems and their detailed resolutions>






Conclusion

<Organized summary of the project>

<What did you learn?>

Project Video

Project Source Code

Advise for Future Students

<Bullet points and discussion>

Acknowledgement

=== References ===